• Chapter
    5 George IV – Chapter 35
  • Year
    1825
  • Concepts
  • Jurisdictional Relevance
  • Number of Articles
    18
  • Description
    An act authorising François Cloutier to build and collect a toll on a bridge crossing the Rivière Sainte-Anne County of Northumberland between the Parishes of Sainte-Anne and Joachim. Cloutier is granted the authority to take and use of the land required to build the bridge. Standards and stipulations for the bridge's construction and maintenance are outlined. The allowable tolls that can be charged are described, as well as those to be excepted from tolls. Additionally, after a period of fifty years, it is made lawful for the Crown to assume possession of the bridge. Time restraints allowed for the construction and repairs are outlined, as well as penalties for those who neglect the tenets of the bill.
  • Source
    Not available